Cost-effective cleanup program helps eliminate non-productive time
Download PDFMature Fields
Implement a cleanup solution to avoid losses in the upper lateral section
Middle East
CleanWell Solutions, which include single-trip tools, chemicals, and a dedicated filtration system
A major operator in the Middle East needed an all-encompassing wellbore cleanup solution for a trial well experiencing static losses in the well’s openhole lateral section. Wellbore cleaning tools, chemicals, and filtration services would be needed to prepare the well for completion, so finding the right combination was critical.
With CleanWell Solutions, Halliburton was able to successfully execute the job, enabling the operator to avoid losses in the upper lateral. This was accomplished with zero non-productive time (NPT) and with no additional costs to the operator’s authorization for expenditures (AFE).
The operator required a customized wellbore cleanup program to ensure that the well would be ready for the completion phase. This required a dedicated bottomhole assembly (BHA) solution to avoid inducing fluid loss, along with field-proven cleanup chemicals and a dedicated filtration system.
A major complication was the fact that the openhole lateral had previously been experiencing fluid losses at a rate of 7 barrels per minute (bpm) into the formation. Therefore, it was important that flow rates and equivalent circulating densities (ECDs) were monitored and controlled to prevent any losses.
Halliburton subject matter experts developed an integrated solution to maximize efficiencies and protect the operator’s production targets.
CleanWell® mechanical wellbore tools were recommended to recover debris and enhance well hydraulics during the displacement by using a ball-activated circulating sub. A wellbore cleanup pill train was designed and optimized using Completion Fluid Graphics (CFG™) modeling, which delivers full predictions of pump rates, velocities, and ECDs. A dedicated filtration system was specified based on well fluid properties, volumes and costs.
Non-productive time (NPT)
bbl of brine filtered
Pounds of debris recovered
Halliburton Mag Tech® magnets and Vali Tech® filters recovered a total of 47.3 pounds (21.45 kilograms) of debris. Debris material ranged from metallic fines and shavings to larger coarse-metal debris and perforation debris.
The wellbore cleanliness specifications set by the operator were achieved in a cost-effective manner. All completion brine (approximately 8,000 bbl of brine) was filtered down to a 2-micron absolute standard through dedicated cartridge units at an average rate of 10 bpm. Final fluid returns showed less than 0.1 percent total suspended solids and 35 NTU.
The operator was impressed with the planning and execution of the integrated solution, and with how smoothly and professionally the solution was executed. The operator’s team agreed that, had these recoveries not been made, NPT would have occurred during the completion phase, adding costs to the operator’s AFE.
Mag Tech Riser Magnet
Maximizing ferrous debris recovery where hydraulic removal is most difficult
Download Data SheetVali Tech Filters
The CleanWell Riser Vali Tech is a filtering tool designed to actively recover debris that was unable to be circulated out of the hole before, during, and after displacement from drilling mud to completion fluid.
Download Data SheetReduce well construction costs with the latest-generation of filtration services, wellbore cleanup fluids, mechanical wellbore cleaning tools, and optimized software modeling.