The FloRite multilateral completion system provides TAML Level 5 junction pressure integrity and re-entry capability without pulling the upper completion. Re-entry access to the lateral improves the efficiency of future interventions and workover operations. The FloRite system has the capability to upgrade an existing TAML Level 4 junction to a TAML Level 5 should the requirement for pressure isolation be identified as the well matures.
Production from each lateral can be segregated to surface with the installation of a dual completion; an optional vector block facilitates single-string commingled flow. An intelligent comletion interface enables monitoring and flow control of each lateral branch, helping you maximize hydrocarbon recovery.
The Halliburton FlexRite multilateral system is robust, versatile, and configurable for TAML Level 5 pressure sealed junctions
The IsoRite multilateral completion system provides through-tubing re-entry capability in TAML Level 2 and 4 wells.
The MillRite milled exit multilateral system provides consistent and geometrically controlled casing exit.
MATURE FIELDS
FloRite TAML Level 5 multilateral completion system provides junction isolation and helps eliminate gas migration
Read case studyFloRite Completion System adds Level 5 pressure isolation and selective re-entry access to an existing level 4 multilateral junction.
Success Rate
Level 5 Installations
Data Sheet
For multilateral wells that require complete junction pressure isolation